News

Ezi-Duct ducting installed at BatteryEnergy factory

  •  6 October 2009
  • 0 comments
Ezi-Duct ducting installed at BatteryEnergy factory

EZI-DUCT says its modular and flexible ducting has been installed at BatteryEnergy’s factory in Fairfield, Sydney.

Almax Ducting & Plumbing installed the Ezi-Duct modular and polyurethane flexible ducting. The extraction system is being used by BatteryEnergy to remove lead dust and fumes.

According to Almax Ducting & Plumbing, it opted for Ezi-Duct’s modular ducting due to the company’s service and the reliability of the products.

Ezi-Duct ducting clamps together, so the system can be pulled down easily for cleaning or for clearing blockages. Ezi-Duct claims its ducting provides the best air flow on the market with its smooth bore tube with pressed 90 degree bends.

Ezi-Duct also provides the Ezi-Flex polyurethane composite product range which is manufactured in Germany.

Add a comment

| More

Add a comment Comments

No comments found, be the first to add one.
Thank you very much.

Your comment has been submitted.

Required

Please enter your name.

Required, but never displayed.

Please enter a valid email address.

Optional, and linked if provided.

Required and you can write upto 600 words for your comment.

Please enter your comment and limit it to 600 words.

Required

Please enter the code shown on the right.
Check this box to receive the latest updates in our email newsletter.
to get Factory Maintenance
delivered to your inbox

Recent comments

International bills to pay? Sign up now!